OA Library

Hallthwaites Wastewater Treatment Works, Millom Without, Cumbria: Rapid Desk-based Research and Walkover Survey

Bullock, Vicky (2009) Hallthwaites Wastewater Treatment Works, Millom Without, Cumbria: Rapid Desk-based Research and Walkover Survey. Project Report. Oxford Archaeology North. (Submitted)

[img]
Preview
PDF
Full Report 230409.pdf

21MB

Abstract

United Utilities have proposed to construct a pipeline in the highway from Hallthwaite, Cumbria (NGR 318239, 485397) through The Green and onto Strands, with three pumping stations along the route and a new Wastewater Treatment Works near Strands (NGR 18186, 484443; Fig 1). The pumping stations will comprise an underground well and above ground kiosk with landscaping and access required. The treatment works (NGR 318667, 483809) are likely to comprise a combination of above and below ground structures with access and landscaping. Following recommendations made by the Cumbria County Council Historic Environment Officer, United Utilities commissioned Oxford Archaeology North (OA North) to undertake rapid archaeological desk-based research and a walkover survey of the proposed pipeline route.

Item Type:Monograph (Project Report)
Subjects:Geographical Areas > English Counties > Cumbria
Period > UK Periods > Medieval 1066 - 1540 AD
Period > UK Periods > Post Medieval 1540 - 1901 AD
ID Code:1570
Deposited By: Sandra Bonsall
Deposited On:14 Feb 2014 13:40
Last Modified:14 Feb 2014 13:40

Repository Staff Only: item control page